assemble phase, part 2

Mount T-nut on the inside of buffle.

Drilled through holls.

Set cap bolts temporarily.

Dig pits.

Check diamater of the pit.

Apply some bond.

Fix the unit with bolt and T-nut. No problem.

Finish stand with "pine yellow" colored varnish.

Bond right side part and buffle.

Cut pipe to use duct.

Bond (left + read) + (right + buffle).

Bond top and bottom.

Assemble is complete. Do finish.

Second time of splay varnish. left: before, right: after.

Third time of splay varnish. left: before, right: after.

Finish is complete.

Prepare duct.

Wireing, set duct and mount unit, everything is done!